BUILDING: Tempe 3 – INDITEX Group
LOCATION: Elche (Alicante, Spain)
YEAR: 2019
MATERIAL: Ceramics
INSTALLING COMPANY: Marmolería José Rey
STROW SYSTEM: Anchorage System T40 + Delta Staple Hidden Clip S.17
BUILDING: Tempe 3 – INDITEX Group
LOCATION: Elche (Alicante, Spain)
YEAR: 2019
MATERIAL: Ceramics
INSTALLING COMPANY: Marmolería José Rey
STROW SYSTEM: Anchorage System T40 + Delta Staple Hidden Clip S.17
Ventilated Facades STROW Sistemas Copyright © 2021
Pol. Ind. de Bértoa. Rúa do Titanio, Parcela C34
15105 Carballo (A Coruña)